Mandatory Digital Occurrence Reporting: The Duty Holder Translation

A concise statutory breakdown of the Building Safety Regulator’s mandatory digital occurrence reporting requirements for commercial and mixed-use estate duty holders.

EFM

EntireFM Compliance Directorate

Statutory Governance & Regulatory Policy

3 min read2026-08-27
Commercial electrical switchroom compliance survey

Commercial electrical switchroom compliance survey

STATUTORY COMPLIANCE TRANSLATION
LEGAL DUTY
01 · What Changed

The Building Safety Regulator has clarified that duty holders cannot outsource ultimate legal liability for unrecorded structural, fire barrier, or M&E modifications to third-party managing agents. All physical changes must be indexed to the building’s digital Golden Thread within 48 hours of sign-off.

02 · Who It Affects

Commercial landlords, estates directors, corporate facilities heads, and responsible persons managing residential, student accommodation, or mixed-use multi-tenanted commercial buildings.

03 · What You Need To Do

Audit your current CAFM asset change-log. Ensure every M&E maintenance contractor provides verified digital commissioning sheets, photographed fire-stopping penetrations, and traceable engineer credentials before work orders are closed out.

04 · When It Matters

Immediate action required for active PPM cycles and planned Q4 remedial works. Non-compliant logbooks expose duty holders to formal enforcement notices and invalidate property insurance terms.

Statute: Building Safety Act 2022 / The Higher-Risk Buildings (Key Building Information etc.) RegulationsAuthority: Building Safety Regulator (HSE)

Detailed Operational Breakdown

Under the new enforcement regime, the Building Safety Regulator has established that digital occurrence reporting must be integrated directly into day-to-day facilities management workflows rather than treated as an annual desktop compliance review.

What Constitutes a Reportable Safety Occurrence?

  • Uncontrolled failure of common-area fire suppression or smoke extract systems lasting > 24 hours
  • Discovery of compromised fire compartmentation in vertical service risers or ceiling voids
  • Unplanned loss of primary incoming electrical or water supplies to critical life safety plant
  • Structural movement or façade cladding detachment identified during drone or visual surveys