Select Facility Scope & Cost Index
£392,500
2026 – 2035 projected spend£146,000
5 plant items past expected life18.5 years
Oldest asset in estate: 28 yrs2027
Largest single replacement cycleAsset Category, Age & Condition
Supply and extract air handling units, filtration stages, coils, and fans.
Rooftop or external packaged air-cooled chillers with integral condensers.
Commercial condensing gas heating boilers, burner assemblies, and flues.
Commercial passenger lift installation, car, traction machine, and controller.
Multi-layer built-up bituminous reinforced roofing membrane with cap sheet.
Main low-voltage switchboards, busbars, and primary incoming distribution panels.
Addressable commercial fire alarm control panel, repeaters, loop interfaces, and sounders.
Sectional or one-piece GRP potable cold water cisterns and distribution pipework.
Variable-speed booster pump skid, expansion vessels, and system pressurisation units.
Network video recorder (NVR), switch infrastructure, and high-definition IP cameras.
Why Strategic Lifecycle Planning Matters
This capital expenditure planner provides an indicative lifecycle model based on generalised UK commercial plant service lives and user-declared asset condition. It is designed for forward budgeting and strategic prioritisation only. It does not constitute a physical structural survey, invasive M&E inspection, or fixed-price quotation. A formal capital expenditure schedule requires an on-site technical condition assessment by a qualified engineer.
Rolling Forecast (2026 – 2035)
- Flat Roof Cap Sheet Membrane6 yrs overdue
- Condensing Gas Boilers5 yrs overdue
- Rooftop Packaged Chiller 10 yrs overdue
- + 1 more overdue plant items
Planning plant replacements or major capital tenders?
EntireFM provides comprehensive on-site M&E plant condition surveys, thermal imaging, asset tagging, and turnkey capital project management nationwide.