What Is a Method Statement?
A Method Statement (frequently referred to in UK industry as a Safe System of Work (SSoW)) is a detailed, formal document that specifies the exact, step-by-step sequence in which a work task will be carried out safely and without risk to health.
While the Risk Assessment calculates potential hazards and evaluates initial risk scores, the Method Statement is the practical operational guide for engineers on site. It details how the controls identified in the risk assessment will actually be executed in the physical plantroom, switchroom, or roof space.
Typical Contents of a Commercial Method Statement
To satisfy facilities management review desks, an approved Method Statement must contain eight mandatory components:
Exact building name and address, client work order reference, specific room/location, and clear boundary of the task.
Names and contact details of the lead engineer, site supervisor, appointed first aider, and required competency card types (e.g. ECS Gold, Gas Safe).
List of all hand tools, 110V power tools, access equipment (podiums, MEWPs), calibrated test instruments, and rigging gear.
Chronological numbered instructions from arrival and sign-in through service isolations, component replacement, commissioning, and final sign-out.
Exact procedure for proving dead, applying padlocks and warning tags, draining pressurised pipework, or blanking gas lines.
Disposal routes for removed components, hazardous waste consignment notes (fluorescent tubes, batteries, refrigerants, oils), and spill kit provisions.
Top 5 Method Statement Mistakes to Avoid
- 1
Vague Statements ("Work Carefully")
Writing "the engineer will proceed with caution" fails to define a safe system of work. Be specific: "Engineer will place GRP barriers at a 2-metre radius and isolate breaker MCB-04."
- 2
Ignoring Emergency Rescue Plans
Stating that workers will wear a harness is inadequate. The method statement must state how a suspended or injured worker will be rescued within 15 minutes.
- 3
Missing Operative Signatures
A method statement is legally worthless if the operatives executing the task have not read and signed it. The sign-off sheet must accompany the site file.





